Prices checked October 2026. 0% VAT on home solar and batteries ends 31 March 2027. Read how it works

Open book

Sources and dates

Every figure on this site comes from a published source. We check them regularly and show the date. Prices and rates change, so treat all figures as estimates.

  • GOV.UK, VAT Notice 708/6: energy-saving materials. Zero rate 1 May 2023 to 31 March 2027, then 5%. A standalone battery and a battery retrofitted to solar are covered from 1 February 2024. Source (Read 7 October 2026)
  • HMRC, Revenue and Customs Brief 10 (2026): temporary zero rate of VAT for domestic electricity in Great Britain, 1 October 2026 to 31 March 2027. Source (Published 8 September 2026)
  • Ofgem, changes to the price cap 1 October to 31 December 2026: electricity 26.32p per kWh and 54.83p a day standing charge (Great Britain average, standard variable tariff, direct debit). Source (Published 26 August 2026)
  • Ofgem, Smart Export Guarantee: SEG tariff rates must always be above zero. Source (Read 7 October 2026)
  • Octopus Energy, Smart Export Guarantee: a flat 4.1p per kWh for every unit exported, open to customers of any import supplier. Outgoing Octopus 12p per kWh. Source (Read 7 October 2026)
  • British Gas, Export Premium 12p per kWh for its electricity customers (systems up to 15kW); Export SEG 3p per kWh for others. Source (Page updated 27 August 2026)
  • E.ON Next, Export Premium v3: 17.5p per kWh fixed for 12 months, for solar or battery installed by E.ON Installation Services from 10 November 2025. Source (Read 7 October 2026)
  • EDF, Export Exclusive 12m V3: 18p per kWh, for solar, a battery or both bought from EDF after 2 March 2026. Source (Read 7 October 2026)
  • Energy Saving Trust, solar panels: about £7,600 for a typical 4.5 kWp system; payback of 9 to 12 years across four cities on July 2026 fuel prices; typically about 12p per unit exported; panels last 25 years or more. Source (Updated 1 October 2026)
  • Energy Saving Trust, battery storage: £1,500 to £10,000, about £4,600 for 5 kWh; typical life 10 to 12 years. Source (Updated 6 October 2026)
  • Energy Saving Trust, plug-in solar: legal in Great Britain from 27 August 2026; from around £450; about £70 to £100 a year; 800W; one device per home; register before use; landlord or freeholder permission. Source (Updated 1 October 2026)
  • GOV.UK, households can save as plug-in solar panels come to market: up to 800W, up to £110 a year, permissions to check before installing. Source (Published 26 August 2026)
  • Planning Portal, solar equipment mounted on a house or a block of flats: 200mm projection, not above the highest part of the roof, conservation area and listed building limits, plug-in solar not on timber-clad surfaces. Source (Read 7 October 2026)
  • MCS, record number of UK households combining renewables: 210,000 installations in the first half of 2026, 36,000 batteries, 92% of battery installs onto homes with solar. Source (Read 7 October 2026 (page undated))
  • GOV.UK, Warm Homes Plan announcement: government-backed zero and low interest loans for solar panels, batteries and heat pumps. Source (Published 20 January 2026)
  • GOV.UK, Warm Homes Loan Scheme lender applications (first stage closed, further window expected later in 2026). Source (Updated 17 September 2026)
  • Octopus Energy public tariff data for the South East (region J), read from the public tariff interface: Intelligent Octopus Go 12-month fixed 7.6p night rate; Octopus Go 12-month fixed 9.5p; Octopus Go variable about 8.2p cheap window; Cosy about 12.6p cheap rate. Source (Read 7 October 2026)
  • GOV.UK, Boiler Upgrade Scheme grant raised from £7,500 to £9,000 for oil and LPG homes from 21 July 2026. Source (Published 26 June 2026)
  • GOV.UK, EV chargepoint grant for flat owners and renters: up to £500, available until 31 March 2027. Source (Updated 1 April 2026)
  • National Grid, G98 connection procedures: micro-generation up to 16A per phase, installation document within 28 days of commissioning. Source (Read 7 October 2026)
  • legislation.gov.uk, Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 14. Source (Read 7 October 2026)
  • ONS Census 2021 via Nomis, accommodation type for the Swale local authority: 60,495 households; 33.7% semi-detached, 29.8% terraced, 23.9% detached, 8.6% purpose-built flats. Source (Census 2021)
  • ONS, Census 2021 area changes for Swale: 67.0% owned, 18.4% private rented, 13.3% social rented. Source (Census 2021)
  • Planning data platform, conservation area records supplied by Swale Borough Council (52 records, including Faversham Town, Faversham - Ospringe, Faversham - Preston-next-Faversham, three at Boughton, two at Selling and two at Graveney). Source (Read 7 October 2026)
  • Planning data platform, Kent Downs boundary: our own point check found Sheldwich and Throwley inside it and Faversham town centre outside it. Boundaries cross parishes, so check your address. Source (Checked 7 October 2026)
  • Wikipedia, Faversham: creek, market, parish church, Davington Priory, Southeastern rail links. Source (Read 7 October 2026)
  • Wikipedia, ME postcode area, with the village pages for Oare, Teynham, Sheldwich, Selling and Throwley. Source (Read 7 October 2026)
  • European Commission, clean energy islands: guidance on salt exposure for solar PV in coastal areas (IEC 61701 salt mist; corrosion-resistant mounting). Source (Published 1 July 2026)
  • UK Power Networks, annual review: its South Eastern Power Networks area serves South London, Kent, East Sussex and parts of Surrey and West Sussex. Source (Read 7 October 2026)

What is our own estimate

The cost ranges and savings on our cost pages are our own estimates, built on the sources above. They assume a typical roof making about 900 kWh for each kWp a year, 35% of solar power used in the house, a battery that loses about 10% of power, and a house using 3,000 kWh a year. They are not quotes. Last reviewed 7 October 2026.

Call usWhatsApp us